龍騰鑫高鐵 3 community cover photo

XIN GAOTIE 3

龍騰鑫高鐵 3

Zuoying District・Huaxia Road / Chonghe Road / Wentian Road

Specialist community
龍騰建設(天玉集團)Developer
The developer does not publish a completion or use-permit date; pre-handover status requires current documentsCompletion
24 floors above ground / 5 basement levelsFloors
2–3-bedroom; approx. 22–39 pingSize range

COMMUNITY OVERVIEW

Community overview

龍騰鑫高鐵 3 is a residential project in Zuoying District, around Huaxia Road / Chonghe Road / Wentian Road, that remains under construction or before confirmed handover. No nearby building is used as a substitute for its rental data.

Public project information lists 龍騰建設(天玉集團) as the developer, with The developer does not publish a completion or use-permit date; pre-handover status requires current documents, 24 floors above ground / 5 basement levels, and homes planned around 2–3-bedroom; approx. 22–39 ping. Unit details and building rules still require individual confirmation.

The project is still under construction or pending confirmed handover (The developer does not publish a completion or use-permit date; pre-handover status requires current documents). No uniquely matched MOI whole-unit rental record is available yet; data will be updated after handover using the address, floor count and completion details.

Developer
龍騰建設(天玉集團)
Completion
The developer does not publish a completion or use-permit date; pre-handover status requires current documents
Floors
24 floors above ground / 5 basement levels
Size range
2–3-bedroom; approx. 22–39 ping

COMMUNITY RENTAL DOSSIER

鑫高鐵 3: location, building and leasing conditions

龍騰鑫高鐵 3 is a residential project in Zuoying District, around Huaxia Road / Chonghe Road / Wentian Road, that remains under construction or before confirmed handover. No nearby building is used as a substitute for its rental data. Public records list 龍騰建設(天玉集團) as the project entity, The developer does not publish a completion or use-permit date; pre-handover status requires current documents, 24 floors above ground / 5 basement levels, and 2–3-bedroom; approx. 22–39 ping.

  • Zuoying District · Huaxia Road / Chonghe Road / Wentian Road
  • The developer does not publish a completion or use-permit date; pre-handover status requires current documents
  • 24 floors above ground / 5 basement levels
  • 2–3-bedroom; approx. 22–39 ping

Zuoying HSR district

NEIGHBORHOOD GUIDE

XIN GAOTIE 3 neighbourhood guide

XIN GAOTIE 3 is at Huaxia Road / Chonghe Road / Wentian Road, Zuoying District, within the wider Zuoying HSR district area. Huaxia, Chonghe, Chongxin and Wenxue roads form the main residential corridors of the Zuoying HSR district. The area's strength is regional and city transit, but access differs by building entrance, road crossings and pick-up traffic.

Building-level location

Start from Huaxia Road / Chonghe Road / Wentian Road

XIN GAOTIE 3 is publicly located around Huaxia Road / Chonghe Road / Wentian Road, Zuoying District. Check metro, shopping and leisure routes from the building's actual entrance before extending the search to the wider Zuoying HSR district area; walking distances from other buildings are not reused.

Getting around

Zuoying combines THSR, TRA Xinzuoying and R16 on the Red Line, serving both intercity and Red Line commutes. Actual transfer time depends on the building location and station entrance used.

Daily essentials

The station provides transfer and traveller services, while everyday shopping is spread across Huaxia, Chongxin and Wenzi roads and nearby blocks. A viewing should test the routes to the shops and services the resident will actually use.

Leisure and public space

Lotus Pond and historic Zuoying provide waterfront and cultural destinations to the west. Reaching them may involve walking, cycling or a short local connection depending on the building's block.

  1. 01

    LOCATION

    Access and daily life around Huaxia Road / Chonghe Road / Wentian Road

    The building is in Zuoying District, around Huaxia Road / Chonghe Road / Wentian Road. Access time, street noise, outlook and walkability depend on the actual entrance, route, floor and orientation, so no unit-level claim is inferred from the community name.

  2. 02

    BUILDING

    Building facts are kept separate from unit conditions

    Public sources list 龍騰建設(天玉集團), The developer does not publish a completion or use-permit date; pre-handover status requires current documents, 24 floors above ground / 5 basement levels, and 2–3-bedroom; approx. 22–39 ping. Title area, usable interior area, parking, management rules and furnishings still require unit documents and an on-site check.

  3. 03

    LEASING

    Rental evidence starts after confirmed handover

    No rent is inferred before confirmed handover and a reliable address match. Nearby buildings are not used as substitutes.

BUILDING FACILITIES

Facilities listed in public sources

Availability, rules, fees and current condition must be confirmed with the building and on site.

The public source does not yet list facilities that can be verified item by item, so none are prefilled.

View public project source

COMMUNITY QUESTIONS

鑫高鐵 3 frequently asked questions

Direct answers based on the sources currently available. Unit-specific conditions still require individual confirmation.

01How should I assess the neighbourhood and commute from XIN GAOTIE 3?
Start from the actual entrance around Huaxia Road / Chonghe Road / Wentian Road, Zuoying District, then compare metro, bus, walking or driving routes for the intended destination. The page places the building within Zuoying HSR district, but does not reuse distances measured from another community.
02Where is 鑫高鐵 3?
龍騰鑫高鐵 3 is in Zuoying District, around Huaxia Road / Chonghe Road / Wentian Road. Confirm the exact entrance and route on site.
03What are the building and layout plans?
Public sources list 龍騰建設(天玉集團), The developer does not publish a completion or use-permit date; pre-handover status requires current documents, 24 floors above ground / 5 basement levels, and 2–3-bedroom; approx. 22–39 ping. Unit title documents and building rules govern.
04How should an owner prepare a unit for leasing?
Prepare the title and layout, floor and orientation, parking, furnishings, management-fee terms, available date and building rules before setting a rent or tenant profile.

Own a unit here? Start with the unit details

Building, floor, orientation, layout and equipment can all change the leasing plan.

Book a property review
LINE
CallLINE